---
product_id: 468491074
title: "10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))"
brand: "cermant"
price: "€ 22.34"
currency: EUR
in_stock: true
reviews_count: 6
category: "Cermant"
url: https://www.desertcart.hr/products/468491074-10pcs-450v-47uf-aluminum-radial-electrolytic-capacitor-kit-long-leads
store_origin: HR
region: Croatia
---

# 450V high voltage rating 47µF large capacitance 105°C heat resistant 10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))

**Brand:** cermant
**Price:** € 22.34
**Availability:** ✅ In Stock

## Summary

> ⚡ Charge your creativity with capacitors that keep up!

## Quick Answers

- **What is this?** 10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in)) by cermant
- **How much does it cost?** € 22.34 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.hr](https://www.desertcart.hr/products/468491074-10pcs-450v-47uf-aluminum-radial-electrolytic-capacitor-kit-long-leads)

## Best For

- cermant enthusiasts

## Why This Product

- Trusted cermant brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Built to Last:** Heat-resistant up to 105°C for durability in demanding environments.
- • **DIY Essential Kit:** 10-pack radial electrolytic capacitors with long leads, perfect for hobbyists and pros alike.
- • **Precision & Stability:** Low leakage and low impedance minimize energy loss and signal distortion.
- • **Power Up Your Projects:** Robust 450V rating ensures reliable performance under high voltage demands.
- • **Capacitance That Counts:** 47µF capacity delivers stable energy storage for precision electronics.

## Overview

This 10-piece kit of Cermant 450V 47µF aluminum radial electrolytic capacitors offers high voltage tolerance, stable capacitance with ±20% tolerance, and heat resistance up to 105°C. Ideal for tube amplifiers, vintage radio repairs, and precision DIY electronics projects, these polarized capacitors feature low leakage and low impedance for optimal performance.

## Description

Cermant 10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in)): desertcart.com: Industrial & Scientific

Review: Good quality and high voltage rating. - These seem to be very good quality capacitors, and the 450V rating is great for my hobby renovating antique radios.
Review: Within specified tolerance and working well - Working well as replacement capacitors in an 82-year old broadcast/shortwave radio.

## Features

- Nominal Capacitance :47uF,Rated Voltage:450V.Electrolytic capacitor size:16X25mm(0.63x0.98in).
- The use of anti-static bags for packaging, not easy to damage.High quality electrolytic capacitors with stable performance
- This Polarized Capacitors Heat resisting, low leakage, low loss and low impedance.
- Capacitance Tolerance: electrolytic +/-20% Operating Temperature Range: -40deg/C ~105+deg/C
- Feature: Unit capacity is large, with radial termination style.Tinker, DIY and hobbyists must! Great for repairs and little projects.

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B0B8HTJ23T |
| Best Sellers Rank | #29,934 in Industrial & Scientific ( See Top 100 in Industrial & Scientific ) #130 in Industrial Electrical Capacitors |
| Brand Name | Cermant |
| Capacitance | 47 Microfarad |
| Capacitance Tolerance | 20 |
| Customer Reviews | 4.9 4.9 out of 5 stars (26) |
| Item Dimensions W x H | 0.63"W x 0.98"H |
| Item Shape | Round |
| Manufacturer | Cermant |
| Material Type | Aluminum |
| Maximum Voltage | 450 Volts |
| Mounting Type | Through-Hole Mount |
| Operating Voltage | 450 Volts |
| Upper Temperature Rating | 105 Degrees Celsius |

## Product Details

- **Brand:** Cermant
- **Capacitance:** 47 Microfarad
- **Material:** Aluminum
- **Operating Voltage:** 450 Volts
- **Shape:** Round

## Images

![10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in)) - Image 1](https://m.media-amazon.com/images/I/71y8WXzXDsL.jpg)

## Available Options

This product comes in different **Style** options.

## Customer Reviews

### ⭐⭐⭐⭐⭐ Good quality and high voltage rating.
*by K***N on November 18, 2025*

These seem to be very good quality capacitors, and the 450V rating is great for my hobby renovating antique radios.

### ⭐⭐⭐⭐⭐ Within specified tolerance and working well
*by C***H on September 25, 2025*

Working well as replacement capacitors in an 82-year old broadcast/shortwave radio.

### ⭐⭐⭐⭐⭐ good price and quality
*by T***D on August 21, 2023*

I keep purchasing these electrolytics. They measure in tolerance and have great filtering characteristics.

## Frequently Bought Together

- Cermant 10pcs 450V 47UF Aluminum Radial Electrolytic Capacitor Kit Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier(16X25mm(0.63x0.98in))
- ALLECIN Capacitor 470uF 100V Elkos Capacitors 470μF 100V Aluminium Electrolytic Capacitor 16x25mm Electrolytic Capacitors 470uF MFD 105°C (Pack of 10)

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.hr/products/468491074-10pcs-450v-47uf-aluminum-radial-electrolytic-capacitor-kit-long-leads](https://www.desertcart.hr/products/468491074-10pcs-450v-47uf-aluminum-radial-electrolytic-capacitor-kit-long-leads)

---

*Product available on Desertcart Croatia*
*Store origin: HR*
*Last updated: 2026-07-29*